The Planning Succession Workshop Onsite Prep.

Everything you need to get ready is right here!

Pre-Onsite Workshop Prep

What to complete before we gather

Go to Section

Onsite Schedule

What we'll cover during our two days

Go to Section

Post-Onsite Meetings

Virtual call schedule after our onsite

Go to Section

Pre-Onsite Workshop Prep

What to complete before we gather

Read Succession Starts Here

While the BibleĀ doesn't offer a "How-to" manual on succession, it does provide timeless principles for navigating transitionĀ well.

WeĀ created this resource because we believe the best place to go whenĀ thinking about succession is the Bible.

We've summarized 9 passages and offered questions to inspire thoughts and conversation for individuals and teams.

We encourage you to prayerfully work through this in preparation for our time together.

Download Succession Starts Here

Watch the 7 Foundational Actions

These are the mental models we share to help reframe the way peopleĀ approach the topic of succession.

These videos are a part of our online Planning Succession Resource. You will receive login instructions for the full resource later, but for now we ask that you invest 40-minutes to watch these eight videos.

We've provided a download to take notes as you follow along.

Download 7 Foundational Actions Workbook
 

Foundational Action 1:
Follow Wisdom's Voice

From page 11 in the Planning Succession Workshop

Time: 3m 15s

Ā 

 

Foundational Action 2:
Say the Same Thing

From page 12

Time: 6m 52s

 

Foundational Action 3:
Steward the Season

From page 13
Time: 8m 56s

 

Foundational Action 4:
Unwind the Conversation

From page 14
Time: 7m 53s

 

Foundational Action 5:
Distribute the Weight

From page 15
Time: 1m 36s

 

Foundational Action 6:
Manage Frequency Dynamics

From page 16
Time: 5m 43s

 

Foundational Action 7:
Change Metaphors

From page 17
Time: 5m 06s

 

Build Your Life Map

It is importantĀ to reflect on where we have been as we prepare to chart the pathway forward.

Like with the 7 Foundational Actions, this video is part of the Sherpa's online Planning Succession Resource. We have included it here for ease of access.

Note: Where it is ideal for this to be completed before our time onsite, it is ok to complete this afterwards.

Download Life Map Instructions
 

ONSITEĀ SCHEDULE

What we'll cover during our two days

Day 1 (4 hours)

Introductions andĀ Foundational Actions

Present Your Life Map (if completed)

Conduct the Organizational Assessment

Select Your Process Pathway

Day 2 (4 hours)

Explore the 5 Essential Signposts

Design Your 1st Draft Succession Plan

Introduce the Latitude of Disclosure

Instructions for Building the Communication Strategy

Post-Onsite Meetings

Meeting schedule after our onsite

Post Onsite TeamĀ MeetingĀ without Sherpa

Within two weeks of the onsite session, meet as a team to formalize your initial succession planning strategy. Your team will present the plan in our first virtual coaching session.

Virtual Coaching Calls with Sherpa

Session 1: Your team presents your succession plan

Sessions 2 & 3: Your team builds out the communication strategy.

Sessions 4 - 10: Your drive the agenda. We help you address what's most pressing.

Note 1: Our preference is to complete your Team Meeting and Coaching Calls 1, 2, & 3 within 6-8 weeks of our onsite.

Note 2: A sub-committee determined by you will meet with Sherpa for sessions 2-10.